Process
Our Retail Center Construction Process
Retail center construction in Irving follows a structured process from program planning through phased tenant opening. The anchor tenant's opening date drives the construction schedule, and in-line tenant phasing is planned to support leasing velocity rather than holding all openings to a single date.
Step
Retail program and anchor tenant coordination
We start with the retail program: anchor tenant type and receiving requirements, in-line tenant mix and bay sizes, food and beverage tenant utility demands, parking ratio requirements, and City of Irving site plan approval status. For Irving community retail serving the ISD residential base, that includes confirming that the anchor tenant's requirements are compatible with the site's utility capacity and planned parking configuration before design is committed.
Step
Site and utility planning on Dallas County clay
Retail center site planning in Irving requires Blackland Prairie clay subgrade treatment under parking areas and flatwork. Parking lot sections on untreated clay deteriorate quickly under retail traffic — particularly in areas receiving truck deliveries at the dock. We specify and inspect clay treatment under all retail parking and flatwork areas, not just the building pad, to prevent the parking lot deterioration that creates maintenance costs and customer experience problems for the retail landlord.
Step
Shell and site infrastructure delivery
Shell delivery is sequenced to give the anchor tenant the longest preparation period before their opening date. In-line shell bays are completed in sequence based on leasing priority. Site infrastructure — utilities, parking lights, signage, monument sign, and outdoor dining areas — is staged to match the opening sequence rather than waiting for complete retail center construction before any infrastructure is activated.
Step
Multi-tenant TI and phased opening coordination
Each in-line tenant's TI permit is managed through the City of Irving building department as a separate permit from the shell. We coordinate TI permit submissions with each tenant's lease execution and opening target so the TI contractor mobilizes as soon as the shell is ready for the specific tenant bay. That coordination is the difference between a retail center that opens with 80 percent occupancy and one that opens with 30 percent occupancy because TI permitting created a bottleneck.
Step
Turnover and certificate of occupancy
Retail center turnover includes the anchor tenant CO, shared area CO for parking and site infrastructure, and individual in-line tenant COs as each TI is completed. We manage those inspections as an integrated program coordinated against each tenant's opening date so the City of Irving inspection schedule does not become a bottleneck for tenant openings that are marketing-committed.